|
Name |
Safe Operating Procedure (SOP) / Safety Literature |
Safe Work Method Statement (SWMS) |
APA Safe Work Method Statement(SWMS) |
|
Air Compressors and Air Tools |
|||
|
Angle Grinder |
|||
| Anode Installation TR Unit | |||
|
Asbestos |
|||
|
Backhoe |
(Revised 3/3/14) |
||
| Blowing Down Gas Main by Flaring | Open | ||
| Chains and Slings | Open | ||
| Chock and Block | Open | ||
|
Compressed Air |
|||
|
Concrete Sawing |
|
(Revised 3/3/14) |
|
|
Confined Space HIGH RISK |
Open | ||
|
Demolition |
|||
| Diesel Fuel | Open | ||
| Decontamination, general | Open | ||
|
Earthworks |
|
(Revised 3/3/14) This SWMS is to be used in conjunction with SWMS specific to items of plant |
|
|
Electric Power Tools |
(Revised 3/3/14) |
Open | |
| Electrical Arcs and Blasts | Open | ||
|
Emergency Procedures - Contact with Utilities |
|||
|
Emergency Procedures - General |
|
||
| Emergency Procedures - Plant Rollover | Open | Open | |
| Emergency Procedures - Vehicle Accident | Open | Open | |
| Emergency Procedures - Trench Collapse | Open | ||
| Ergonomics | Open | ||
|
Excavator |
|||
| Excavator Auger Attachment | Open | ||
| Eye and Face Protection | Open | ||
|
Fatigue |
|||
| Fire Safety | |||
| First Response Leak Attendance and Repair | Open | ||
| Foot and Leg Protection | |||
|
General Safety |
|||
| Grinder | Open | ||
| Hand Protection | Open | ||
| Hazard Assessment | Open | ||
|
Hazardous Substances |
|||
| Hearing Protection | Open | ||
|
Heat Stress |
Open | ||
|
Heights |
|||
| High Voltage Overhead and Underground Electrical Cables/Work Near Energised Electrical Installations HIGH RISK | Open | Open | |
| Install Gas Meter | Open | ||
|
Isolation Procedures |
|||
| Jackhammer - Pneumatic | Open | ||
| Ladders, portable | Open | ||
| Loading and Securing Machines and attachments for safe transport | Open | ||
| Manual Handling/Lifting Mobile Plant | Open | Open | |
| Material Stacking and Storage | Open | ||
| Mobile Phones | Open | ||
| Monoxide Poisoning | Open | ||
| Moving Plant HIGH RISK | Open | ||
| Near Misses | Open | ||
| New PE Main Installation | Open | ||
| New Service Installation | Open | ||
| New Steel Main Installation | Open | ||
| New Work Site Checklist | Open | ||
| Operator Visibility Around Heavy Equipment | Open | ||
|
Oxy-Acetylene |
|||
| Pinch Points | Open | ||
| Plants and Wildlife | Open | ||
| Portable Generators | Open | ||
| Pressurised Gas Distribution Main or Consumer Piping - Work on or near HIGH RISK | Open | ||
| Pressurised Water | Open | ||
| Purging - Direct / Indirect | Open | ||
| Refueling Equipment | Open | ||
|
Roads - Work on or adjacent HIGH RISK |
Open |
Open | |
| Safety Belts and Fall Arrest Systems | Open | ||
|
Skid Steer |
(Revised 3/3/14) |
||
| Slips, Trips and Falls | Open | ||
| Spill Response | Open | ||
| Steel Stopple Operations | Open | ||
|
Tippers |
Open | ||
| Traffic | Open | ||
| Trailer - Plant | Open | Open (9/4/14) | |
|
Trenching & Excavations |
Open |
||
| Trench more than 1.5m deep - working in and excavating HIGH RISK | Also see Trenching & Excavations above | Also see Trenching & Excavations above | Open |
|
Underground Services |
Open |
||
| Wacker Packer | |||
| Welding - Field | |||
| Workshop Fabrication |